Proven 15-Step
Delivery Framework

Every Intigreat project follows a structured workflow — from the initial client brief through installation, testing, and final handover with complete as-built documentation. No shortcuts. No surprises.

Quality Commitment

All installations are completed per Good-for-Construction drawings approved by the consultant. Every component used is inspected and certified with calibrated test certificates before final handover.

Our Process Flowchart
Intigreat Solutions process diagram
1

Data Collection & Client Brief

Collecting relevant data and determining client and consultant requirements for the electrical installation project.

2

Brief Installation Report

Submission of Brief Installation Report and Operations Manual for client review and approval before works commence.

3

Preliminary Design Approval

Receiving and reviewing preliminary designs from consultants. Coordinating approvals before mobilisation.

4

Tender Documents & BOQ

Filling tender documents including detailed specifications and Bill of Quantities for accurate project costing.

5

Tender Drawings Review

Receiving and thoroughly reviewing Tender Drawings — layouts and schematics — prior to execution.

6

Technical Specifications

Receiving technical specifications for the project and assisting in determining quality of components to be used.

7

Good-for-Construction Drawings

Receiving consultant-approved GFC drawings and conducting pre-installation design verification.

8

Equipment & Material Approval

Providing and getting approval for all equipment and installation materials before procurement begins.

9

Equipment Procurement

Assisting the client in selecting and procuring major equipment from approved, reliable suppliers.

10

Installation & Commissioning

Installing, testing and commissioning the total electrical system including substation, panels, and distribution per GFC drawings.

11

Invoice Preparation

Preparation of progress and milestone invoices per agreed billing schedule throughout the project.

12

Periodic Site Visits

Making periodic site visits for the client — inspecting work quality, site safety and schedule adherence.

13

Equipment Inspection & Certification

Inspection of all equipment with witnessing by calibrated certificates ensuring every component is verified before handover.

14

Handover

Formal handing over of completed electrical installation with all relevant documentation, warranties and test records.

15

As-Built Drawings & Final Submission

Preparation of comprehensive As-Built Drawings and Final Submission package — the complete record of the installed system.

Structure Creates Excellence

Our structured 15-step process eliminates ambiguity, ensures compliance, and delivers projects on time — every time.

Zero Defects

Multiple inspection and testing checkpoints ensure defect-free delivery.

On Schedule

Structured milestones and periodic visits keep every project on track.

Full Documentation

Complete as-built drawings and submission package at handover.